Dreizack — Navbar
Dreizack logo
MDFS aluminium formwork manufacturing system
Dreizack Aluminium Formwork

About Dreizack Formwork Solutions

Technical Advantage in Modern Construction

Dreizack Formwork Solutions (DFS), based in Mumbai and established in April 2017, provides innovative and reliable solutions for the construction industry. With over 18 years of expertise in Monolithic, Modular and Climbing Formwork Systems, as well as Scaffoldings, we deliver efficient solutions for modern RCC structures.

DFS works closely with leading technology and manufacturing partners to provide engineered, cost-effective, and high-quality formwork solutions. Through strong collaboration and technical expertise, we aim to support the advancement of modern civil engineering and construction practices.

18+ Years Experience

Extensive expertise across multiple formwork and construction systems.

Engineered Solutions

Cost-effective and technically advanced solutions for modern construction.

Trusted Partnerships

Strong collaboration with technology and manufacturing partners.

Why Choose Us

Built on precision, backed by people who show up

Manufacturing Excellence

Backed by advanced machinery and stringent quality controls, our production facilities are designed to deliver high-precision, durable, and reliable formwork systems that meet global standards.

End-to-End Support

From initial design consultation to on-site technical assistance and post-sales coordination, we partner with you at every stage of the project — ensuring smooth execution and complete peace of mind.

Experienced Team

Our team consists of seasoned industry veterans who bring deep expertise, practical insight, and a solution-oriented mindset to every project.

Long Lifecycle

MDFS formwork systems are engineered for reusability and built to last. With a high-quality finish and robust build, our products ensure lower long-term costs and better construction outcomes.

Applications

Where the tie-plate system goes to work

One system, engineered to hold its line across every vertical element on site — from core walls to the smallest column.

Manufacturing Process

From raw aluminium to a dispatch-ready panel

Dreizack manufacturing facility producing aluminium formwork panels
01

Raw Material

02

Cutting

03

Multi Punching

04

Multi Milling

05

Robotic Welding & FSW

06

Lacquering

07

Washing

08

QR Scanning

09

Dispatch

9-stage process — raw material through to dispatch

Our Work

Projects built on the Dreizack system

A look at where our tie-plate and panel systems have gone to work — across residential towers, commercial builds, and infrastructure sites.

View all projects

Features

Engineered into every panel, before it reaches site

Higher number of repetitions

Panels built to be reused pour after pour without losing shape or finish.

Faster construction

Quicker assembly and strike times shorten the cycle on every floor.

Saving on labour costs and expenses

A smaller crew handles more area, cutting site labour spend.

No wooden wastage

Reusable aluminium panels remove timber shuttering from the site entirely.

Low investment

A lean upfront cost that pays back quickly across repeat use.

Dreizack — Footer